This is a great advantage if you re working on an uneven floor.
Metal stud to floor slab. Steel stud partitions with framing 24 o c. Head of wall firestop system firestop sealant. Use the track for blocking top plates that run parallel to joists often need to be fastened to braces. For floor penetrations approximately 8.
Spacing over studs 16 o c. Cut a metal floor track to fit the proposed stud wall length using a circular saw with a metal cutting blade. Check out our business page on facebook for more. But the open sides on a metal track are straight while the open sides on a stud bend inward at the top.
Ceiling attenuation class of gridstone ceiling. A long span composite floor system offering performance improved schedule and cost effectiveness. Wood stud chase walls. When attaching to steel use a 1 2 type a steeler p n 31 or 1 2 type sds steeler p n 34.
Step 3 lay the metal track flat on the concrete floor with the flat side down. Caulk materials these materials are applied from a caulking tube or pail or are spray applied. Steel stud partitions with framing 16 o c. They dry to form a flexible seal.
Drifttrak headed stud pts saves the time and expense of installing drifttrak after the post tensioned concrete slab pts has been poured by integrating it directly into the slab before pouring. The headed studs come preinstalled to the drifttrak and function as the attachment to the post tensioned slab instead of welding to the pour stop angle and use of paf s or anchors. Wood stud partitions with framing 16 o c. Area separation fire walls.
Typically used in walls floors and curtain wall slab edge conditions where strength and economy are required. Shorter than the actual measurement. Ul design u465 v438. Simple how to video describing in detail on how to anchor metal studs into a concrete slab.
You can cut steel studs about 1 4 in. Ss 112 1 hour chase wall to steel deck. Ss 110 1 hour partition to concrete slab. Installation a walls 12 src is placed parallel to the floor with attaching flange down and attached with a 1 1 4 type w steeler p n 300 or type s steeler p n 368 for wood stud applications.
A metal track looks similar to a metal stud. Don t worry about cutting your metal studs to fit perfectly. Steel studs conventional 3 4 1 2 1 2 2 45 min. Steel stud chase walls.
You could use wood but joe prefers to use scrap pieces of the track instead. Wood stud partitions with framing 24 o c. Attaching bottom stud plate to slab if there were basement walls holding back any kind of lateral hydrostatic force they would be blocked or concrete.